Demolition - Out goes the old.... Seeing the potential for change

Demolition has now been fully completed.

Once there was a shabby kitchen, now there is just a clean space ready for the electrical and plumbing trades.




Our hideous 1950's bathroom is now gone, plumbing is in and GPOs are also installed. We are going for a rain shower as well as a hand held shower. Shower will be tiled in (walk in shower) so we will need do some additional carpentry on the floor to allow for the shower insert.




HUGE TIP: we are using flick mixers, the mixer cartridge needs to installed in the wall and correct plumbing to fit needs to be installed, prior to plastering. This is also an important consideration if any of your bath and vanity taps are in-wall.




Laundry has been demolished and plumbing resupplied to the correct areas. All old pipes have been capped off. You will need a licenced plumber to do this.




The window in our master bedroom has been removed, and the existing "kitchen sink in bedroom" has been removed with all plumbing works capped off. A walking wardrobe will be added to this space at a later stage.
 
 